LUGANSK
TRANSPORT INFRASTRUCTURE DEVELOPMENT Lugansk is the center of 440 thousand people agglomeration. The resident population is 435 thousand. The area of the city is 256 km2 . The population density is 1722 people / km2.
TRANSPORT NETWORK The total length of the city's route network is 1316 km 450 buses and 6 trolleybuses operate on city routes.
The aim of the proposal is
effective management and control of the city passenger transportation, a
proper road safety and improvement of the quality of providing passenger services.
The estimated cost of the investment proposal is 643,8 million rubles The payback period is 5,8 years
GREENHOUSE FACILITIES DEVELOPMENT
Implementation of the investment proposal is offered on the basis of Lugansk Public Utility Company "Industrial complex of greenhouse facilities and city improvement". Cucumbers and tomatoes are proposed as the main cultivated vegetables.
In 2016, three greenhouses with a total area of 0.2 hectares were used for the experimental vegetable (cucumbers, tomatoes) and seedlings cultivation. During the period from June to September 2.8 tons of products were produced and sold in the city markets. The estimated cost of the investment proposal is 15,2 million rubles The payback period is 7,2 years
CONSTRUCTION OF GARBAGE DISPOSAL COMPLEX
It is planned to implement the investment proposal on the basis of the public utility company "Lugansk Waste Management center". About 600 thousand cubic meters or 120 thousand tons of household waste are taken out to solid waste landfill annually. The estimated cost of the investment proposal is 17,3 million rubles The payback period is 11,6 years
LUTUGINO DISTRICT
RECONSTRUCTION OF THE ROLLING MILL PRODUCTION AT THE STATE ENTERPRISE "LUTUGINO RESEARCH AND PRODUCTION ROLLER PLANT"
Within the framework of the project implementation, it is planned to perform current and major repairs of the plant, to reconstruct machinery equipment, to purchase charge and auxiliary materials and energy resources. The estimated cost of the investment proposal is 308,8 million rubles The payback period is 9 years
APPLE ORCHARD PLANTING OF INTENSIVE TYPE
The intent and purpose of the proposal is to plant an apple orchard by means of intensive technology and to meet
needs
of
the
Republic’s
inhabitants for apples, grown in an environmentally friendly way.
The estimated cost of investment
proposal is 31,58 million rubles The payback period is 2 years
CONSTRUCTION OF CANNING SHOP WITH VEGETABLE STOREHOUSE FOR APPLES PROCESSING
Construction of a shop for apples processing and canning with a vegetable storehouse is planned in
order to preserve nutritional value and basic chemicals and intended for a long-term storage.
The estimated cost of the investment proposal is 2,47 million rubles
The payback period is 1, 3 years
ALCHEVSK
ORGANIZATION OF SUNFLOWER OIL PRODUCTION
Organization of production of sunflower oil with the lowest energy costs. The proposal envisages providing the population of the city and neighboring settlements with high-quality unrefined sunflower oil. The annual output is 98,6 thousand liters. The estimated cost of the investment
proposal is 1,3 million rubles The payback period is 2, 5 years
SETTING UP OF GREENHOUSE FARM FOR VEGETABLES GROWING
The construction of a greenhouse complex on the area of 638.25 m2 is planned on the basis of greenhouse sector of the Utility Enterprise "ADEU". It is planned to receive high-quality vegetable products with 23 tons of annual production volume. The estimated cost of the investment proposal is 4,5 million rubles The payback period is 3 years
ORGANIZATION OF MINI-BAKERIES WORK
Today provision of the city with its own bread production is 35% of the need. The project envisages a phased increase of the city own production market up to 47,6%.
The estimated cost of the investment proposal is 4,28 million rubles The payback period is 3,4 years
SETTING UP OF WOOD WASTE FUEL PELLETS PRODUCTION
It is planned to provide consumers with high-performance alternative fuels with a high heating capacity and prolonged combustion cycle. The planned volume of production is 1 thousand tons of pellets per year. The required volume of raw materials is 3100 m3. The estimated cost of the investment proposal is 4,5 million rubles The payback period is 3,3 years
SETTING UP OF PRODUCTION SITE FOR CONCRETE PRODUCTS MANUFACTURE
The project envisages to provide the city with concrete products (lids for wells, paving slabs, angle curbstone, vases, urns and others). The annual volume of production is 832,8 m3 of concrete products. The estimated cost of the investment proposal is 1,8 million rubles
The payback period is 4 years
SETTING UP OF THE PRODUCTION SITE FOR PLASTIC WASTE PROCESSING AT MUNICIPAL SOLID WASTE LANDFILL
It is planned to organize plastics crushing with separation of valuable fractions suitable for recycling. The planned volume of production is 100,8 tons of recycled plastic
per year. The estimated cost of the investment proposal is 1,2 million rubles The payback period is 3, 3 years
PEREVALSK DISTRICT
RESUMPTION OF PAO PPH "CHERVONIY PRAPOR" WORK
The project proposes setting up of 5 blocks to keep 150 thousand chickens in order to meet needs of the republic's inhabitants in poultry products The estimated cost of the investment proposal is 166,6 million rubles
EXTRACTION OF HARD COAL IN THE TERRITORY OF PEREVALSK DISTRICT
• of balance reserves
• of exceeding balance reserves • depth of bedding Coal deposits are widespread throughout the district in the layers of Gorlovskaya (C27), Almaznaya (S26), Maksimovskaya (S24), Kamenskaya (S25) suites The estimated cost of the investment proposal is not less than 20 million rubles.
EXTRACTION OF BUGAEVSKIY SANDSTONE DEPOSIT
Bugaevskiy deposit site No 1 with an area of 17.0 hectares
balance reserves with 5729 thousand м3
rock stone for crushed stone production for construction works in accordance with the State Standard 23845-86 The estimated cost of the investment proposal is 19,8 million rubles The payback period is 2 years
SVERDLOVSK CITY AND SVERDLOVSK DISTRICT
COAL BRICKS PRODUCTION FACTORY
Coal bricks production is based on the small fraction fines of anthracite coals and coal-concentrating waste at the production facilities of the “Clean Energy” LLC. Briquetting of coal dust is not
too expensive as it is a profitable production. The estimated cost of the investment proposal is 5,8 million rubles The payback period is 1 year
ANTRATSYT AND ANTRATSYT DISTRICT
BUILDING OF THE TOURIST CENTRE “SMALL COAL”
The territory of the proposed tourist center construction is environmentally friendly. The "Small coal" tourist centre will be built of wood and other environmentally friendly materials. The advantage is the availability of developed infrastructure facilities. The estimated cost of the investment proposal is 7,6 million rubles The payback period is 4, 1 years
BUILDING OF WASTE PROCESSING COMPLEX
The complex comprises highly productive, easily assembled frameless
structures. The line includes a conveyor system, a cabin with sorting posts. The composition of the equipment and the layout of the line can be changed at customer’s will thanks to the modular construction principle. The estimated cost of the investment proposal is 45,2 million rubles The payback period is 2,1 years
BUILDING OF ENERGY EFFICIENT AGRICULTURAL ENTERPRISE FOR PRODUCTION AND PROCESSING OF GOATBREEDING PRODUCTS “HEALTHY NUTRITION IS OUR CITIZENS’ HEALTH”
The proposal envisages the construction of a full cycle complex: a plant for the production of mixed fodder, 2 fattening complexes, a module for the production of milk on the industrial basis (the total number of population will be 600 female goats), a section for goat manure processing into organic fertilizers, the purchase and installation of appropriate equipment for the production mentioned above, as well as the further operation of production lines with a capacity of 500 tons of milk per year. The estimated cost of the investment
proposal is 43,5 million rubles The payback period is 5,5 years
GREENHOUSE ECONOMY START UP
The proposal envisages reconstruction of a greenhouse in the area of 1000 sq. m. and cultivation of organic vegetables there, which will meet 10% of the population's need during the off-season period. The estimated cost of the investment proposal is 2,6 million rubles The payback period is 4,5 years
FARM ENTERPRISE START UP
The aim of the investment proposal
is
to
produce
ecologically clean products (fowl, pork) to meet people’s needs.
The estimated cost of the investment
proposal is 2,4 million rubles The payback period is 2,1 years
Chemicals plant «Syntes» (synthesis) is equipped with hi-tech facilities. It gives an opportunity to produce a full paints and lacquers’ choice for building and repairing works. The estimated cost of the investment proposal is 5 million rubles The payback period is 1 year.
INDUCTION MELTING COMPLEX
The proposal envisages outmoded cupola furnace substitution for induction furnace at SUE «Stakhanov Machinery and Repair plant». Installation of induction complex will allow to raise productivity and to reduce production costs. The estimated cost of the investment proposal is 6 million rubles
The payback period is 3 years.
SETTING UP OF GREENHOUSE COMPLEX USING ALTERNATIVE HEAT SUPPLY SOURCES FOR VEGETABLE PRODUCTION
Greenhouse complex • Gross floor area of block of winter multispan hothouses is 1 ha, including section of growing, seedling section and technical zone for engineering and supporting purpose. • Administration and accommodation block with service zone and finished product storage. •Electricity supply infrastructure. The estimated cost of the investment proposal is 92,7 million rubles The payback period is 7 years
BUILDING OF AUTOMATIC GASFILLING COMPRESSOR HOUSE
The project proposes favorable regime of petrol station treatment for cars and buses of urban and suburban traffics passing through the center of the city. Steady demand and lack of competition make this proposal attractive.
The estimated cost of the investment proposal is 40,7 million rubles The payback period is 7 years
DRY-CLEANING CITY SERVICE START UP
Expensive hi-tech equipment will be used for providing these types of services. It will provide region residents with a high quality drycleaning service. The estimated cost of the investment proposal is 9,7 million rubles
The payback period is 3-4 years
“CLEAN SOURCE” DISTIL DRINKING WATER PRODUCTION
Competitive enterprise with a powerful production facility will be able to get a substantial market share of drinking-water realization. Bryanka residents will be provided with distil drinking water by means of its further realization on sales outlets and residential areas of the town. The estimated cost of the investment
proposal is 7,8 million rubles The payback period is 1 year
COLLECTION, SORTING AND RECYCLING OF SOLID MUNICIPAL WASTE (SMW)
It is planned to implement the investment proposal on the basis of SUE LPR
"The Enterprise of
Bryanka penal colony of the
Directorate for execution of punishment of the Ministry of Internal Affairs of Lugansk People's Republic".
The estimated cost of the investment proposal is 21,4 million of rubles The payback period is 3-4 years
SETTING UP OF BREAD, SHORTCRUST AND PUFF PASTRY PRODUCTION
The proposal envisages production and sale of more than 160 tons of products per month reaching the maximum planned capacity. The main groups of products to be produced are: cakes, puff pastry, biscuits, rusks, buns, round cracknels (dried and shredded), baked goods. The estimated cost of the investment proposal is 75 million rubles
The payback period is 3 years
CONSTRUCTION MIXTURES PRODUCTION START UP
The project proposes start up of the construction mixtures production in the territory of LLC "PCF "STROYBIZNES". Because of the difficult situation in the republic, construction materials are in great demand being strategically important goods.
The estimated cost of the investment proposal is 17 million rubles
The payback period is 7 years
KRASNODON AND KRASNODON DISTRICT
CONSTRUCTION OF HOTHOUSE COMPLEX FOR GROWING VEGETABLES
The project envisages
construction of 10 greenhouses with a total area of 1 hectares, with all-year round growing of cucumbers and tomatoes.
The estimated cost of the investment proposal is 32,4 million rubles
The payback period is 5 years
THE DEVELOPMENT OF A COMPLEX FOR THE BROILER MEAT PRODUCTION
Recovery of the poultry state farm in Semeykino, Krasnodon district is planned, including 7 isolated grounds, 38 houses and 2 incubator. The production capacity of the slaughterhouse is up to 7 thousand heads per shift.
The estimated cost of the investment proposal is 30 million rubles The payback period is 3 years
THE RESUMPTION OF PRODUCTION AT PUBLIC JOINT-STOCK COMPANY "KRASNODON MEAT"
Production capacity of the enterprise envisages production of 8.5 tons of sausages and smoked products, meat half-finished products and pelmenis per a shift. Planned production capacity per month is 55 tons of meat products.
The estimated cost of the investment proposal is 31 million rubles The payback period is 2 years
The recycling of coal dumps
The purpose of the investment proposal is recycling of mine dumps in the territory of "Pervomayskaya-West" mine with the extraction of coal material, as well as rare earth elements, and building materials. According to preliminary information, there are 8 179 thousand cubic meters of moldboard mass in the mine territory. The estimated cost of the investment proposal is 6,12 million rubles The payback period is 2 years
KRASNYI LUTCH
CONSTRUCTION OF GREENHOUSES FOR GROWING VEGETABLES (TOMATOES, CUCUMBERS)
It is planned to construct greenhouses for growing tomatoes and cucumbers to provide people with fresh and high quality products. The proposal envisages building of 18 greenhouses on the area of 4,4 hectares.
The estimated cost of the investment proposal is 5, 53 million rubles
The payback period is 1, 1 years
Lugansk People’s Republic Investment proposals of the free land areas "Greenfield" and industrial areas "Brownfield"
Lugansk Greenfield - 5 With total area of 1,8 ha
Kirovsk Greenfield -4 With total area of 210,57 ha
Brownfield – 2 With total area of 15,86 ha
Antracit Greenfield - 11 With total area of 47,226 ha Brownfield- 1 With total area of 6,0 ha
Krasnyi Lutch Greenfield – 1 With total area of 6,0 ha
Brownfield – 1 With total area of 1,43 ha
Krasnodon Greenfield- 11 With total area of 297,47 ha
Alchevsk Greenfild-5 With total area of 3,4 ha Brownfield- 2 With total area of 7,7 ha
Lutugino Greenfield – 6 With total area of 161,73 ha Brownfield – 7 With total area of 54,7 ha
Bryanka Greenfield - 9 With total area of 69,08 ha Brownfield - 1 With total area of 85,68 ha
Pervomaisk Greenfield- 1 With total area of 2,0 hа
Perevalsk Greenfield – 3 With total area of 1,7 hа
Brownfield – 1 With total area of 11,13 hа
Rovenki
Stakhanov
Greenfield – 5 With total area of 12,84 hа
Greenfield – 2 With total area of 2,4 hа
Brownfield - 2 With total area of 10,49 hа
Brownfield – 7 With total area of 80,96 hа
Sverdlovsk Greenfield – 8 With total area of 46,99 hа
Slavyanoserbsk Brownfield - 1 With total area of 4 hа
We hope for long - term and beneficial cooperation!