Latest Version: 7.1 Design to Operate: Production
Question: 1 Which time elements are considered during backwards scheduling for planned orders? Note: There are 3 correct answers to this question. A. Goods receipt processing time B. Opening period C. Quality inspection time D. Goods issue processing time E. In-house production time
Answer: A Design to Operate: Production
Question: 2 A goods receipt is posted for a production order. What are the results? Note: There are 3 correct answers to this question. A. Actual costs are credited to the production order. B. A EWM inbound delivery order could be created. C. The production order is deleted in the stock/requirements list. D. The stock account is credited. E. Internal labor costs are posted.
Answer: A Design to Operate: Production
Question: 3 What documents can be generated during an MRP Live Run for external procured materials? Note: There are 2 correct answers to this question. A. Purchase Order B. Purchase Requisition C. Schedule Line D. Planned Order
Visit us at: https://www.examsempire.com/c-iee2e-2404
Answer: B, D Design to Operate: Production
Question: 4 During the period-end closing, what steps can be run with background processing? Note: There are 3 correct answers to this question. A. Order release B. Order confirmation C. WIP determination D. Variance Calculation E. Order settlement
Answer: C Design to Operate: Production
Question: 5 Which areas are covered in SAP Integrated Business Planning? Note: There are 3 correct answers to this question. A. Cost Center Planning B. Demand-driven replenishment C. Supplier Lifecycle Management D. Inventory E. Supply Chain Control Tower
Answer: B Design to Operate: Production
Question: 6 When running MRP, what setting in the material master determines whether a material will be procured or produced? A. MRP type B. Procurement type C. Purchasing group D. Processing key
Visit us at: https://www.examsempire.com/c-iee2e-2404
Answer: B Design to Operate: Production
Question: 7 What does a work center control? Note: There are 2 correct answers to this question. A. Calculation of costs of work performed B. Release of production orders C. Availability of capacity D. Valuation of bill of material components
Answer: A, C Design to Operate: Production
Question: 8 Which values need to be settled to Financial Accounting and Margin Analysis during settlement of a production order? Note: There are 3 correct answers to this question. A. Work in Progress B. Variance Categories C. Confirmation of Time D. Goods issue postings of materials E. Price Differences
Answer: A
Visit us at: https://www.examsempire.com/c-iee2e-2404
-1-
Thank You for Trying Our Product Special 16 USD Discount Coupon: NSZUBG3X Email:
[email protected]
Check our Customer Testimonials and ratings available on every product page.
Visit our website. https://examsempire.com/
https://examsempire.com/ Visit us at: https://www.examsempire.com/c-iee2e-2404